The concrete prepared on-site is twice less expensive
than the mixture produced in a concrete unit; |
 |
Minimum time required to prepare for the work
of concrete laying and to do the job; |
 |
No interference with the work of other
workers - the concrete is fed by means of flexible
rubber hoses, passages and stairwells of the building
do not get obstructed. Such method of feeding the
mixture is very convenient - buckets do not damage
walls, conveyors are not occupied. |
 |
The concrete that has been delivered to the site
does not need to be carried by hand or transported
by conveyor, the continuous supply of "fresh"
mixture ensures that the mixture retains its hardening
characteristics. |
 |
Plastificators (chemical additives) are added
into the concrete mixed for heated floors. They
improve the heat conductivity of concrete and increase
the density of concrete. Addition of polypropylene
filament reduces the fracture of concrete due to
fluctuations of temperature. |
 |
No excess mixture is produced, only the amount
necessary on a particular day is prepared. Hence
the economy of ingredients of the mixture. |